Katalog GES



Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness

Several heuristics are presented for the flowshop scheduling problem with the objective of minimizing mean tardiness. We consider the cases in which job sequences on all machines are the same (permutation flowshop) and in which they may be different. For the former case, the various methods that... Full description

1st Person: Kim, Yeong-Dae
Source: in Journal of the Operational Research Society Vol. 44, No. 1 (1993), p. 19-28
More Articles
Type of Publication: Article
Language: English
Published: 1993
Keywords: research-article
Heuristics
Scheduling
Sequencing
Online: Volltext
Volltext
  Search for full text
LEADER 01607nma a2200325 c 4500
001 JST050652338
003 DE-601
005 20180529100927.0
007 cr uuu---uuuuu
008 150324s1993 000 0 eng d
024 7 |a 10.2307/2584431  |2 doi 
024 8 |a 2584431 
035 |a 2584431 
040 |b ger  |c GBVCP 
041 0 |a eng 
100 1 |a Kim, Yeong-Dae 
245 1 0 |a Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness  |h Elektronische Ressource 
300 |a Online-Ressource 
500 |a Copyright: Copyright 1993 The Operational Research Society Limited 
520 |a Several heuristics are presented for the flowshop scheduling problem with the objective of minimizing mean tardiness. We consider the cases in which job sequences on all machines are the same (permutation flowshop) and in which they may be different. For the former case, the various methods that have been devised for minimizing the makespan are modified for our objective, while the list scheduling algorithm is used for the latter case. These heuristics are tested and compared with each other on randomly-generated test problems. 
653 |a research-article 
653 |a Heuristics 
653 |a Scheduling 
653 |a Sequencing 
773 0 8 |i in  |t Journal of the Operational Research Society  |d London : Taylor and Francis  |g Vol. 44, No. 1 (1993), p. 19-28  |q 44:1<19-28  |w (DE-601)JST050576186  |x 1476-9360 
856 4 1 |u https://www.jstor.org/stable/2584431  |3 Volltext 
856 4 1 |u http://dx.doi.org/10.2307/2584431  |3 Volltext 
912 |a GBV_JSTOR 
951 |a AR 
952 |d 44  |j 1993  |e 1  |h 19-28 

Similar Items

Cannot find similar records

Library Services

Search Options

Quick links

Orientation